As part of a study of how a 100 per cent renewable energy system in the UK could work academics from UCL have found thatĀ EITHER doubling the amount of increasing international electricity interconnectors OR having one third overcapacity of renewable energy generating capacity will reduce the need for storage to support a 100 per cent … Continue reading Renewable overcapacity or increasing interconnectors will dramatically reduce storage needs in a 100% renewable energy UK say UCL academics
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed